Neo24hours - Preparations for the installation room

There must be:

A: a circuit breaker with high sensitivity (30 mA);

B: a point of connection to the power mains;

C: a point of connection to the water mains;

D: a point of discharge 

The machines must be positioned on the ground only, on floors:

  • that are not sensitive to heat or flammables;
  • perfectly levelled;
  • with a regular surface and free of roughness;
  • that can support the device at full load.


Keep the illustrated minimum clearances around the device: this will facilitate connections to utilities and maintenance.

 

The devices require ventilation at the back, where the vents and coolant unit are found. Therefore, do not place them against the wall but keep them approximately 5 cm away. In order to prevent accidental movements from excessively approach the device to the wall, install the provided spacers on the back of the device (especially if the device is assembled on wheels).