Puff - Preparations for the installation room

  • The environment where the oven will be installed must be well ventilated and fitted with all the openings prescribed for environments with gas installations, in compliance with national and local legislation.
  • Current IEC (International Electrotechnical Committee) regulations require the installation of a multiple pole switch between the oven and the electrical power supply; the switch must have a contact gap of at least 3 mm on each pole.
  • The oven necessarily needs a cold water supply, which must be equipped with a softener with suitable flow rate and pressure (see the technical data and chapter regarding the water connection). For the supply line, a shut-off valve must be installed upstream of the appliance.
  • A water drainage system must be available in the room, positioned in the immediate vicinity of the appliance with the characteristics described in the chapter “Water connection and drainage” of this manual.
  • The electrical isolating switch and the water shutoff valves must all be located near to the appliance, within easy reach for the user.